Friday, 17 May 2013

Its been another busy week on site this week with yet another two crane lifts. We were straight into action on Monday with the first of them, this one was to lift the second floor cassettes into position. Tuesday was a day for carrying out all the tasks such as the infill pieces and the setting out of the wall plate for the trusses to be positioned on. Wednesday the crane was with us again to lift the roof trusses up onto the second floor level where the timber frame erectors spread the trusses out and brace them in readiness for the cranes next visit.
 Meanwhile in and around the timber framers and the scaffolders all but completed their works to the perimeter and loading bays just leaving down the elevation facing the area in which the crane is positioned to enable it to lift the remaining timber frame sections into position.
 



 