Friday, 27 September 2013

It's been another action packed week on site this week, we have had trades starting and trades finishing. The partitions walls are complete now so the plasterer has been following them and plastering the flats. The flats are now complete so that just leaves the communal areas to finish plastering. The brickwork is getting ever closer to its summit. The joinery is continuing to the first floor flats, the decorator has been on site mist coating the flats on all floors and the staircase walls and ceiling making it look a lot brighter. Meanwhile on the top floor the electricians have been carrying out their second fix works to the flats.





Friday, 6 September 2013

Work to the superstructure has moved swiftly on this week until the weather took a turn for the worse on Friday. Internally the plastering is now complete on the first and second floors, the kitchen for the second floor were delivered earlier in the week so the joiner has started to fit these along with his second fixing of the flats to the second floor. The plumbers have started back on site with their second fix to the flats on the second floor also. The decorator was on site early in the week to mist coat the top floor to enable the M&E to start their second fix.