Friday, 14 June 2013

The timber framers fixed the breather paper to the vertical section of the roof and the roofer fixed a metal trim to the flat roof and upstand as shown in the photo. The timber framers continued internally fixing the holding down straps and the foil backed membrane that is fixed to the perimeter walls. The roofing works continued with the fixing of all the edge trims. We took a large delivery of plaster boards for the upper floors and it was took a big team effort to load out the rooms ready for a fresh start next week with the plaster boarding.
 


 
 