We continued moving down the building with the perimeter boarding to the flats, the guys have made good progress and are now in the last flat. The installation of the acoustic floors commenced at the beginning of the week, as can be seen in the photos the walls have been marked out so the joiner can double up with his battens. This gives extra support under the partition wall. The floor is installed in stages as shown, the battens are set out, acoustic insulation is laid between the battens, a plasterboard plank is the laid on top of the battens followed by the chipboard flooring on top of that. A gap is left all the way around the edge where a flanking strip is stapled to the edge of the floor. There were some off sites works carried out this week with the connection to the Gas main completed, this has been brought inside the site boundary to enable the works to be carried out to the flats at a later date.
We are currently getting prepared. for the main sewer connection in the road. Dates for the road closure have been finalised for week commencing 22nd July for four weeks. These essential works will be carried out within the allocated time frame but all involved will be doing their best to complete these works ahead of programme to reduce any inconvenience. We would like to take this opportunity to apologise in advance for any disruption this may cause.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.