All eyes were on the road closure this week. With the site being located right on a bus route and busy short cut it was imperative that the works to the sewer connection were carried out with absolute precision and minimum disruption to the local residents. We got off to good start on Monday when the closure started with the saw cutting of the road, then we started the excavation to the main sewer. Once this was exposed the inspector was on hand to witness the connecting in, and drainage back into site. Once all the drainage was complete the back filling and stoning could be done then in turn the road was reinstated with the tarmac on Friday and the road being reopened that evening. All the site team would like to thank all the surrounding residents for their continued patience whilst these essential works have been undertaken. On site the superstructure is progressing up the building at a good pace and the internal works are coming along well with the first fix plumbing and electrics almost complete. The door casings are being fixed to the second floor so the plasterer can start skimming the flats on Monday.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.